Transmission Manuals – All data about Transmission

P0778  Pressure Control Solenoid “B” Electrical (Shift Solenoid Valve SL2)

Description
Shifting from 1st to 5th is performed in combination with ON and OFF operating of the shift solenoid valves SL1, SL2, S1, S2, S3, S4 and SR, which are controlled by the ECM. If an open or short circuit occurs in the shift solenoid valves, the ECM controls the remaining normal shift solenoid valves to allow the vehicle to be operated safely.

DTC CodeDTC Detection ConditionTrouble Area
P0778The ECM checks for an open or short in the shift solenoid valve SL2 circuit while driving and shifting gears (1 trip detection logic)
Output signal duty ratio equals to 100%
HINT:SL2 output signal duty ratio is less than 100% under normal condition
·Open or short in shift solenoid valve SL2 circuit·Shift solenoid valve SL2·ECM

Monitor Strategy

Related DTCsP0778: Shift solenoid valve SL2/Range check
Required sensors/ComponentsShift solenoid valve SL2
Frequency of operationContinuous
Duration1 second
MIL operationImmediately
Sequence of operationNone

Wiring Diagram

Procedure
1. Inspect No. 2 transmission wire (shift solenoid valve SL2)

a. Disconnect the D64 No. 2 transmission wire connector.

b.Measure the resistance according to the value(s) in the table below.

Tester ConnectionConditionSpecified Condition
2 (SL2+) – 4 (SL2-)20°C (68°F)5.0 to 5.6 Ω
2 (SL2+) – Body groundAlways10 kΩ or higher
4 (SL2-) – Body groundAlways10 kΩ or higher

OK>> Check harness and connector (No. 2 transmission wire – ECM)
NG>> Inspect shift solenoid valve SL2

2. Check harness and connector (No. 2 transmission wire – ECM)

a. Disconnect the D74 ECM connector.

b. Measure the resistance according to the value(s) in the table below.

Tester ConnectionConditionSpecified Condition
D74-12 (SL2+) – D74-13 (SL2-)20°C (68°F)5.0 to 5.6 Ω
D74-12 (SL2+) – Body groundAlways10 kΩ or higher
D74-13 (SL2-) – Body groundAlways10 kΩ or highe

Result

ResultProceed to
NGA
OKB

A>> Repair or replace harness or connector.
B>> Replace ECM.

3. Inspect shift solenoid valve SL2.

a. Remove shift solenoid valve SL2.

b. Measure the resistance according to the value(s) in the table below.

Tester ConnectionConditionSpecified Condition
1 – 220°C (68°F)5.0 to 5.6 Ω

c. Connect the battery’s positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.
OK: Valve moves and makes an operating noise.

Ok>> Repair or replace No. 2 transmision wire.
NG>> Replace shift solenoid valve SL2.